Archive for March 2018

City of Atlanta aims for interconnected bike lanes…

City of Atlanta aims for bike lanes to be more interconnected, emphasizing how to connect existing bike infrastructure,including PATH Trails (#SilverComet, #PATH400,#StoneMountainPATH, #ArabiaMountain)! See the full story at #CurbedAtlanta  http://ow.ly/4P7030j3eJG Photo (ARC and Curbed Atlanta)

Read More

PATH Parkway Part of Publix Marathon/Half Marathon

The Publix Georgia Marathon and Half Marathon, one of the southeast’s premier distance events, runs on PATH Parkway this Sunday morning, March 18th.  Stop by and cheer on the participants! For full race details, please visit the Atlanta Track Club’s event page.

Read More

Atlanta Bike Path Mileage Doubled Since 2012

Our very own PATH Parkway is one of the bicycle trails highlighted in a March 14th, 2018 article in the Atlanta Business Chronicle (ABC).  According to the ABC and Atlanta’s first annual Bicycle Report, the city has doubled the mileage of bicycle paths in just six years.     PATH Parkway, built in connection with the…

Read More

Arabia Mountain Trail near N. Goddard Road CLOSED from March 6 through June

DeKalb County will close the Arabia Mountain Trail between N. Goddard Road and the intersection with the east-west trail from Murphy Candler School from March 6 through June.  The sewer line south of N. Goddard Road has failed and must be replaced.  Mile 5.0-5.8 will be affected.  Start rides from Flat Rock trailhead or Murphy…

Read More